Sabah Electricity
| Type | State-owned enterprise |
|---|---|
| Industry | Energy |
| Predecessor | Sabah Electricity Board (SEB) |
| Founded | 1 Manom 1998 |
| Headquarters | , |
Area served | State of Sabah and Federal Territory of Labuan |
Key people | Ir Ts Mohd Yaakob Jaafar, Chief Executive Officer |
| Services | Electric generation, transmission, and distribution |
Number of employees | 2,600 |
| Parent | Tenaga Nasional Berhad (80 %), Government of Sabah (20 %) |
| Website | www |
Sabah Electricity Sdn. Bhd. toi ko' Sabah Electricity nopo nga syarikat utiliti Sabah i papalabus, papaatod om popotikid ginoris lotirik loolobi id pogun Sabah om Wilayah Persekutuan Labuan. Syarikat nopo diti nga mogowit ginoris lotirik kumaa lobi 600,000 moomomoguno i nokotongkop id kinoyonon miampai ginayo 74,000 km2. Mantad ginumu dii, 82.8% moomomoguno nopo nga domestik nga momoguno yolo 28.8% no mantad ginumu ginoris lotirik i pinaasil. Kiwaa lobi mantad 2,300 kukumalaja id SESB om mogowit kapansalan (stakeholders) koiso nopo dii nga Tenaga Nasional Berhad (TNB) (80%) om Pogun Porinta Sabah (20%).
Sajara
[simbanai | simbanai toud]Minimpuun o bekalan lotirik id Sabah ontok 1910 i noowit do 3 organisasi mitongkiad. Ontok toun 1957, piniamung o kotolu-tolu organisasi diti om mombontuk do Lembaga Lotirik Borneo Koibutan (North Borneo Electricity Board). Kalapas pombontukan Malaysia ontok 1963, numaan powoliho ngaran dii kumaa Lembaga Lotirik Sabah (Sabah Electricity Board). Ontok 1 Manom 1998, pinosiliu swasta o lembaga Lotirik Sabah om pinungaranan kawagu sabaagi Sabah Electricity Sdn. Bhd.[1]
Kapasiti Penjanaan
[simbanai | simbanai toud]Ginumu nopo kapasiti penjanaan SESB nga 866.4 MW, id nombo 50.3% nopo mantad ginumu ginoris i pinalabus nga binoli mantad penjana kuasa bebas (independent power producers toi ko' IPP).
Kapasiti nakapasang do SESB (au kohompit IPP) montok Sabah Grid i mogowit lotirik kumaa kakadayan toponsol mantad Labuan kumaa Tawau nopo nga 430.9 MW om pokionuon maksimum i nokoopi nopo nga 760 MW (gisom Mahas 2010).
Rangkaian Grid Kotogisan Kosilahon (The East Coast Grid) 132kV i popiromut do kakadayan toponsol id Kotogisan Kosilahon nopo nga kiwaa kapasiti poimpasang sogunumu 333.02MW om pokionuon bobos ogumu nopo nga soginumu 203.3MW.
Koingkawason pokionuon lotirik nopo kaka nga id kadar 7.7% sontoun gisom toun 2010 om pokionuon elektrik nopo nga kodimpot kaka 1,500 MW mondidikot toun 2020. TMontok monokodung koingkawason pokionuon diti, mogisuusuai projek penjanaan, kapaatadan om kopotikidan i maan poindalano.
Nopongo iso grid bersepadu i popiromut Grid Kotogisan Kotonobon (West Coast Grid) miampai Grid Kotogisan Kosilahon ontok 28 Madas 2007, om kiikiro 90% moomomoguno i pinoromut do grid bersepadu diti.
Loji Penjanaan Kuasa
[simbanai | simbanai toud]Kointigasan nopo katayadan loji janakuasa nga miagal id siriba:[2]
- Ginumu stesen: 37 (kohompit 12 IPP om au kohompit stesen BELB)
- Ginoris nopo i nakalabus ontok Toun Kousinan 2010 gisom Madas 2010 nga: 1,279.6 GWh (SESB) & 3,075.8 GWh (IPP)
Loji janakuasa do SESB
[simbanai | simbanai toud]Loji janakuasa toponsol
[simbanai | simbanai toud]| Ngaran om kinoyonon | Kawo stesen | Konfigurasi enjin | Kapasiti |
|---|---|---|---|
| SJ Patau-Patau | Termal | 2 x 32MW, 1 x 33MW, 1 x 15 MW | 99.0 MW |
| SJ Hydro Tenom-Pangi | Hydroelektrik | 3 x 22 MW | 66.0 MW |
| SJ Melawa | Termal | 3 x 8 MW, 1 x 20 MW | 31.4 MW |
| SJ Tawau | Termal | 4 x 8 MW, 1 x 12 MW, 1 x 20 MW | 40.0 MW |
| SJ Sandakan | Termal | 2 x 8.5 MW, 2 x 14 MW, 2 x 19 MW | 72.0 MW |
Kapasiti nakapasang tumanud kawo loji
[simbanai | simbanai toud]- DG Diesel (Major) - 21%
- DG Diesel (Minor) - 26%
- DG Diesel (Rural) - 1%
- GT Diesel - 17%
- GT Gas - 18%
- Hydro - 12%
- Mini Hydro - 2%
- Steam Turbine - 3%
Loji do IPP
[simbanai | simbanai toud]- ARL Tenaga - 7%
- Biomass (TSH) - 2%
- Kadamaian, M. Hydro - <1%
- Kinabio - 2%
- Powertron I - 28%
- Powertron II - 20%
- SBPC - 15%
- Seguntor - 2%
- Serudong Power - 5%
- SPC Energy - 5%
- Stratavest - 9%
- Sutera Harbour - 5%
Ginumu kapasiti penjanaan lotirik
[simbanai | simbanai toud]- IPP - 70%
- SESB - Diesel - 11%
- SESB - Gas - 9%
- SESB - Hydro - 10%
Talian kapaatadan
[simbanai | simbanai toud]Sistem nopo i poingoput nga kohompit no Rangkaian Kuasa Kotogisan Kotonobon (West Coast Power grid) om Rangkaian Kuasa Kotogisan Kosilahon (East Coast Power Grid). Konoruon nopo litar kapaatadan (id suang kilometer-litar) gisom Momuhau 2007 nga:[3]
Garis Kapaatadan Tongus (Overhead lines)
[simbanai | simbanai toud]| Kapasiti | Konoruon (kilometer-litar) |
|---|---|
| 275 kV | 492.00 |
| 123 kV | 860.86 |
| 132 kV (EC) | 659.14 |
| 132 kV (WC) | 100.34 |
| 66 kV | 8.51+ |
| Garis Transmisi Voltan Au Pointantu/Au Ointutunan | 12.87+ |
Kabel siriba tana
[simbanai | simbanai toud]| Kapasiti | Konoruon (kilometer-litar) |
|---|---|
| 132 kV | 37.90 |
| 66 kV | 22.16 |
Kabel saralom rahat
[simbanai | simbanai toud]| Kapasiti | Konoruon (kilometer-litar) |
|---|---|
| 132 kV | 29.00 |
Pencawang sumuang toponsol
[simbanai | simbanai toud]| Kapasiti | Ginumu pencawang sumuang |
|---|---|
| 275 kV | 4 |
| 132 kV | 15 |
| 132 kV | 9 |
| 66 kV | 7 |
Kopotikidan kuasa
[simbanai | simbanai toud]Kapasiti sistem kopotikidan giom Magus Ogos 2009:[4]
| Voltage | Konoruon garisan (km) | Ginumu transformer |
|---|---|---|
| 11 kV | 7,421.7 | 5588 |
| 22 kV | 260.0 | 119 |
| 33 kV | 772.9 | 50 |
Pomogunoon lotirik
[simbanai | simbanai toud]- Ginumu moomomoguno gisom Madas 2010: 432,390 moomomoguno[5]
| Sektor | Kopomogunoon (GWh) | Piatus |
|---|---|---|
| Domestik | 1,167.11 | 31% |
| Komersial | 1,440.55 | 39% |
| Industrial | 1,072.75 | 29% |
| Public lighting | 46.59 | 1% |
Intangai nogi
[simbanai | simbanai toud]Sukuon
[simbanai | simbanai toud]- ↑ "Corporate Profile - Brief History". Sabah Electricity Sdn. Bhd. Pinoopi mantad sand̠ad ontok 6 Milatok 2012. Linoyog ontok 13 Gomot 2011.
- ↑ "Corporate Profile - Generation". Sabah Electricity Sdn. Bhd. Pinoopi mantad sand̠ad ontok 6 Milatok 2012. Linoyog ontok 13 Gomot 2011.
- ↑ "Corporate Profile - Transmission Lines". Sabah Electricity Sdn. Bhd. Pinoopi mantad sand̠ad ontok 6 Milatok 2012. Linoyog ontok 13 Gomot 2011.
- ↑ "Corporate Profile - Power Distribution". Sabah Electricity Sdn. Bhd. Pinoopi mantad sand̠ad ontok 6 Milatok 2012. Linoyog ontok 13 Gomot 2011.
- ↑ "Corporate Profile - Electrical Consumption". Sabah Electricity Sdn. Bhd. Pinoopi mantad sand̠ad ontok 6 Milatok 2012. Linoyog ontok 13 Gomot 2011.
Pambasaan potilombus
[simbanai | simbanai toud]- "Sabah Energy Roadmap and Master Plan 2040" (PDF). Energy Commission of Sabah (ECoS). 2023. Pinoopi (PDF) mantad sanḏad ontok 13 Madas 2025.